Data & integrations
Data and integrations for companies of 30–250 people: one picture of the business instead of four that do not add up
We connect the systems a company already has — ERP, CRM, warehouse, e-commerce, portals and the spreadsheets between them — so data is entered once and the director sees one set of numbers. We do not replace your ERP. We build the gateways, the dashboard and the AI agents at the joints, and then we keep the gateways working as each system updates.
Your week
If this is your week
The same order is typed into the ERP, the CRM and a spreadsheet.
The monthly report takes three days and two people, and nobody trusts it.
The last integration was built by a contractor who has since disappeared.
Your customers’ portals do not talk to your systems, so someone copies by hand.
You bought a company, and now there are two ERPs.
The system
What we build
Process
How it works
01
02
03
04
Proof
Real ones
Building-materials brand
6,000
Read the full caseSwitchgear manufacturer
2 days
Read the full case
Ready core
Why weeks, not months
Most gateways are built from the same parts: authentication, mapping, scheduling, error handling, logging. Those are done. What is specific is your field mapping and your business rules.
After launch
What we keep running
Gateways monitored around the clock and repaired after updates on either side. Dashboards adjusted as your questions change. New systems connected. A monthly note on what broke, what we fixed and what to watch.
Limits
When this is not for you
- If you are about to replace your ERP, do that first and integrate after.
- If one system holds everything and nothing else exists, you do not need us yet.
Pricing
How pricing works
Three parts, always.
01
A pilot with a fixed price
02
A build with a fixed estimate
03
A monthly fee that keeps the system running
Questions
Questions about this
Which systems can you connect?
Anything with an API, a database or a scheduled export. We have worked with client CRMs through data export and with custom databases; on the call we ask exactly what you run.
Do you need admin access to our ERP?
For the audit, read-only. For the build, a technical user with the minimum rights the gateway needs. Access is written into the contract and the data-processing agreement.
What happens when our ERP vendor releases an update?
The gateway is monitored; if the update breaks something, we fix it under the monthly plan. That is the main reason the plan exists.
Where does the data layer live?
On your own instance in the EU, or on your server if you prefer.
Contact
Tell us what is missing.
Thirty minutes, in English or Italian. You describe the process; we ask questions. We reply within one working day.
- Response time
- We answer within one working day.
- How we work
- A small team based in Italy, working with companies across Europe in the EU time zone. We visit production sites when a project needs it; the rest runs online.