
Switchgear manufacturer (name under NDA) · Low-voltage electrical panels · Italy
2 days
to a priced quote, instead of about 10
Quoted by hand. Then not.
3 weeks
Unblock
One person holds the prices. Another holds the schedule. Orders live in email. When either of them is on holiday, the company stops quoting, booking or shipping. This is not a staffing problem. It's a structural one, and adding a feature on top of it produces a more sophisticated version of the same fragility.
We write the criteria down. We put the formula in the system. We give each role exactly the screen it needs and nothing else. Where it helps, the system drafts and a person decides. Your ERP stays; we build what it doesn't do and connect the two.
Interactive
| Before | After |
|---|---|
| 3–5 weeks | 1–2 days |
| 3–5 days | 2 hours |
| 3–5 days | under an hour |
| 3–5 days | 10 minutes |
76%
of engineers spend more than four hours a week on procurement and sourcing tasks.
Fictiv, State of Manufacturing 20258–10 h
a week teachers spend grading, in the UK and the US.
Learnosity, 2025
Switchgear manufacturer (name under NDA) · Low-voltage electrical panels · Italy
2 days
to a priced quote, instead of about 10
3 weeks

Alfakom Learning Center · Education · International
3 → 1
three Telegram bots replaced by one app
2 weeks

Talents Music School · Music education · Minneapolis, USA
0
manual payment calculations across 2 locations
A working pilot in days. A full system with roles, documents and dashboards in two to three weeks. Then support: fixes, answers, and the features you find you need.
Where a system uses AI, we classify the risk, log every decision it proposes, document the data it uses and keep a person in charge of the outcome. You receive the technical file with the system. Your legal team gets answers before it asks.
Thirty minutes. You describe the pain and the result you want. We ask questions. If we can help, you get one email with what we found, what we'd build and what it costs. If we can't, we'll say so.